Service page

Mold Manufacturing

Tooling design and mold manufacturing for injection molding and related production environments. Cavity precision, build quality and long-run readiness.

Cavity precision at ±0.01 mm Single-cavity to high-cavitation tools 15-30 day tooling lead time
Mold Manufacturing
30+CNC and EDM machines
±0.01 mmCavity precision
32+Maximum cavitation
15-30 daysTooling lead time

Mold Design and Engineering

Focuses on parting lines, cooling, runner strategy and ejection logic before steel is cut.

Cavity and Core Machining

Highlights CNC milling and wire EDM work used to deliver accurate mold geometry.

Assembly and T1 Testing

Keeps the process grounded in first-sample validation and dimensional review.

Maintenance and Lifecycle Support

Signals long-term tooling responsibility, not only initial build activity.

 

Need help with this service?

Describe your project goals and we will get back to you.

Chat with engineering

Use WhatsApp for quick project questions or direct introductions.

Open chat